Can I use plywood for roofing?

How to Install Plywood Roof Sheathing for the Perfect Roof Shingle Installation. Rather than using batons, which other roofing materials use, Roof shingles are actually installed over a plywood deck. This plywood deck, which covers the entire roof, provides a perfectly straight surface for the shingles to be applied.

What direction do you put plywood on a roof?

A: According to APA—The Engineered Wood Association, wood panel sheathing should be oriented with their strength axis or face-grain direction perpendicular to the roof framing. This provides maximum stiffness and load capacity.

Can you put new plywood over old on a roof?

The new plywood will have to be nailed to the rafters or roof trusses. But, with the old plywood left in place, it will be considerably more difficult to locate the rafters to ensure proper nail placement.

How do you get heavy plywood on a roof?

Take two 2x4s long enough to extend above the roof line by about 2′. Attach another section of 2×4 across them to hold them together at a height that will allow you to stack the plywood on it so that the top of the plywood sticks up above the top of the jack stand at the roof line.

You might be interested:  FAQ: What Is Rated Sheathing Plywood?

How many sheets of plywood do you need for a roof?

Divide the total roof area by 32 to get the number of sheets you will need to cover the roof. A typical 4 foot by 8 foot sheet of plywood covers 32 square feet. If your roof area is 1,600 square feet, 1,600 divided by 32 will mean you need about 50 sheets to cover the roof.

Can I use plywood for shed roof?

Re: What thickness of plywood for shed roof? Shed kits from shed shops tend to use 12mm OSB because it’s cheap. which should lead your thinking to “Will the walls take the load?” If you have 18mm ply, and it’s WBP ply, and you’re not planning to garden on top of it, then it will do the job.

What is better for roofing OSB or plywood?

OSB takes longer than plywood to get saturated, but also takes much longer to dry out. When used as roof sheathing, this tendency to hold moisture means it will degrade faster than plywood when exposed to chronic leaks.

Is CDX plywood good for roofing?

Only use CDX plywood for the interior of a house, where water damage is far less likely. Do not use CDX for roofing, sheds, or other places that are exposed to moisture consistently. The sole exception to this is pressure treated CDX, which can survive for decades without even a protective coating.

Should you stagger plywood on a roof?

Plywood panels should be laid with the face grain perpendicular to the rafter boards. The panels should be installed over two or more spans, with the long dimension or strength axis oriented across the rafter boards or truss cords. Staggering panels by at least two supports is recommended.

You might be interested:  Often asked: What Grade Is Furniture Grade Plywood?

Does it matter which way you lay plywood?

It is exceedingly important that the first whole line of plywood sheets be perfectly straight and square. Each subsequent piece of plywood will depend on the first piece being installed correctly. If you do this properly, you’ll have a beautiful plywood subfloor.

Should plywood be installed vertically or horizontally?

On roofs and floors, sheathing is installed perpendicular to supports because this is the orientation that results in the strongest roof or floor. Wind loads perpendicular to a wall are similar to floor and roof loads, and installing sheathing horizontally makes walls better at resisting wind pressure.

Should I replace the plywood on my roof?

If you are getting a new roof, while you may not necessarily need to have the plywood decking replaced, you should have it carefully inspected by a qualified roofing contractor. The inspection should take place when the old shingles have been removed.

Can you put decking over plywood?

Plywood decking comes in large sheets, which means you can cover the deck easily with the plywood. Instead of the deck taking days to finish, the job can be completed in hours by using plywood for the decking instead of individual boards.

Do you need plywood under shingles?

Wood Board When the original wood shakes or shingles failed, they were typically replaced with asphalt shingles, which require solid sheathing. Rather than rip off all the spaced sheathing and replace it with solid sheathing, the spaces were usually filled in with additional boards.